TEC

ESP Deployment Unit

Zone 2

Skid Mounted with fork lift pockets & Lifting eyes. The unit will be a containerized 2 piece design
First Skid – Hydraulic Power Unit (HPU) area andOperator’s cabin. Sound attenuated cabin with AC, Lights

Second skid Winch Cabin. Winch, Spooling arm, Measuring head will be placed in this cabin